Wernke, R., Junges, I. e Rita, C. de O. (2020) “APLICAÇÃO DO TIME-DRIVEN ACTIVITY-BASED COSTING (TDABC) POR ETAPAS PRODUTIVAS OU POR LINHA DE PRODUÇÃO”, ABCustos, 15(3), p. 78–107. doi: 10.47179/abcustos.v15i3.580.