Wernke, R., Junges, I., & Rita, C. de O. (2020). APLICAÇÃO DO TIME-DRIVEN ACTIVITY-BASED COSTING (TDABC) POR ETAPAS PRODUTIVAS OU POR LINHA DE PRODUÇÃO. ABCustos, 15(3), 78–107. https://doi.org/10.47179/abcustos.v15i3.580